Development finance
£13.9m development loan for a bungalow-led housing scheme in Wisbech
Finance for 79 bungalows and affordable homes within a wider site.

Lender: a specialist non-bank development lender that funds its loans through private co-funders
The situation.
A developer owned a 14-acre greenfield site on the southern edge of Wisbech with detailed planning consent for 117 homes. The mix was 56 private bungalows, 38 apartments for the over-55s and 23 affordable homes. The site lies outside the flood zone, which is unusual locally and is the reason bungalows could be built there. The developer had a record of building large bungalow estates elsewhere and would build the scheme with its own in-house team.
The problem.
The scheme was hard to place as a single loan:
- Size against location. Funding all 117 homes needed a facility of around £19m. Many development lenders will not commit that much to one site in a small Fenland market town.
- Thin sales evidence. No bungalow scheme of any scale had been built in the area for years, and there was little evidence for new apartments. The valuer assumed the 38 retirement apartments would sell at about one a month.
- Build structure. There was no main contractor and no fixed-price contract, so the lender carried more cost risk.
- Site works. High-voltage overhead power lines crossed the land and had to be buried.
- Timing. The first valuation was carried out during the Covid lockdown, without an inspection.
The solution.
Tiger Financial prepared the funding proposal and took it across the senior and mezzanine development market, recording each lender's objections. Scale and the apartment block came up most often. Tiger therefore reshaped the request around the part of the scheme lenders were comfortable with:
- the loan was limited to the 79 bungalows and affordable homes, built in phases
- the apartment block was left outside the facility
- the required loan fell from about £19m to £13,889,000
The facility completed in August 2022 on a 24-month term, secured by a first charge. A small advance was released on day one, with the balance drawn in stages against the monitoring surveyor's certificates.
The result.
Building started in May 2022. Within a year the first phases were complete, and 28 private bungalows had been finished by the summer of 2023.
Rates, terms and lending decisions shown relate to this transaction. They are not current offers or a guarantee of funding for another project.