Development Finance FAQs
Answers on development facilities, land contributions, construction funding and exits, for residential and commercial schemes.

Browse topics
Search questionsFacility size & project fit
What types of development can Tiger finance?
Tiger arranges finance for ground-up residential schemes, conversions and commercial construction, including appropriate mixed-use and specialist property projects. The appraisal must support the build programme, cost base and exit. Property condition, planning status and the scale of structural work determine whether development finance or a refurbishment facility is appropriate.
How much development finance can I borrow?
Tiger considers development facilities from £500,000 to £100m+. Sizing is constrained by the approved development costs, gross development value, day-one security and the borrower’s contribution. The lender also assesses experience, profitability, liquidity and the capacity to complete the scheme if costs or sales assumptions change.
What do loan-to-cost and loan-to-GDV mean?
Loan-to-cost (LTC) compares the facility with the costs the lender recognises in the appraisal. Loan-to-gross-development-value (LTGDV) compares it with the assessed completed value. Both limits apply alongside any day-one LTV limit. Establish whether the quoted facility includes interest and fees and which costs are eligible before comparing offers.
What leverage is available for residential development?
Facilities may be available up to 75% LTGDV and 90% LTC for suitable residential schemes. These are maximum parameters, subject to the lender and transaction, and are not necessarily available together. The binding limit may instead be day-one value, project profitability or the amount of borrower cash required to complete the works.
What leverage is typical for commercial construction?
Commercial construction is typically assessed at up to 65% LTGDV. The proposed use, pre-let or pre-sale position, occupier covenant, location and completed investment value are central to the assessment. An office, industrial or specialist operating asset should not be assessed on residential sales assumptions.
How long should the development loan term be?
The term should cover acquisition where applicable, mobilisation, construction, practical completion and the sale or refinance period. It is agreed against the programme and lender’s product. A construction deadline alone is not an adequate loan timetable: allow for the requirements and realistic duration of the exit.
Land, planning & borrower contribution
Can the facility include land acquisition?
Yes. A development facility can include an initial advance towards the purchase of the site, followed by staged works funding. The initial advance is assessed separately against the site value and transaction. Conditions for releasing construction funds may be more extensive than those required for the land advance.
Can land I already own count towards my contribution?
Existing equity in the site may form part of the borrower’s contribution, subject to the lender’s accepted valuation and its treatment of historic cost and planning uplift. Any secured debt reduces the available equity. Site ownership alone does not demonstrate the liquidity needed for fees, early works or unforeseen costs.
Will a lender recognise an increase in value following planning permission?
Some lenders recognise part of a substantiated planning uplift; others place greater weight on cost or cash invested. The valuation, purchase date, work undertaken and evidence of current demand affect the decision. Confirm the accepted land contribution before relying on uplift to meet the required equity.
Can I obtain development finance before planning permission is granted?
Most construction facilities require satisfactory planning permission and an agreed route to discharging relevant conditions before works funding is released. A separate land or planning bridge may be considered in suitable circumstances. That bridge does not guarantee a later development facility, so the funding and planning risks must be assessed together.
Which planning and statutory matters affect drawdown?
Lenders and their advisers examine the permission, approved plans, pre-commencement conditions, planning obligations and relevant infrastructure or utility requirements. Matters such as access, drainage, environmental conditions and applicable building-control approvals can affect cost and timing. The facility documents specify which items must be satisfied before each advance.
How much cash does the developer need?
The contribution is the gap between the total project funding requirement and the lender’s available advances, allowing for their timing. Cash may be needed for acquisition costs, professional fees, tax, mobilisation and works paid before reimbursement. A facility covering a high percentage of total costs can still leave a significant working-capital requirement.
Does funding 100% of build costs mean the whole project is funded?
No. A lender may fund the approved construction budget while requiring a separate borrower contribution to the land and other project costs. Interest, fees, tax, contingency and working capital must be accounted for. The overall LTC, LTGDV and day-one limits still apply.
Interest, fees & appraisal
How is interest calculated on a development facility?
Interest is commonly calculated on the amount drawn and added to the loan within an agreed interest allowance. The calculation method, compounding and any interest servicing requirement are set by the facility. Some lenders also charge for undrawn commitments, so compare costs using the expected drawdown and repayment schedule.
Are development rates fixed or variable?
Both structures are available in the market. A variable facility may be priced over a reference rate with a contractual floor; a fixed facility offers a stated interest rate for the agreed period. Compare the overall cost, repayment provisions and any hedging or break-cost requirements applicable to the offer.
Which costs should be included in the appraisal?
Allow for the site, acquisition costs, construction, professional fees, statutory and utility costs, contingency, finance charges and disposal costs. Tax treatment and recoverability depend on the project and should be confirmed with the appropriate adviser. The lender may not recognise every expenditure item as an eligible cost for LTC purposes.
What fees apply beyond interest?
Potential costs include arrangement and broker fees, valuation, legal work, project monitoring, drawdown charges, commitment fees and an exit fee. The exit fee may be calculated on the loan or GDV. Ask for the basis and timing of each charge: a quoted interest rate alone is not a complete funding comparison.
How much contingency should I allow?
The appropriate contingency depends on design maturity, procurement, site conditions, conversion risk and the cost plan. The lender and monitoring surveyor assess whether it is sufficient; there is no single percentage suitable for every scheme. Keep contingency identifiable in the appraisal and establish who controls its release.
Can the developer use the calculator as a funding offer?
No. The development finance calculator provides an initial illustration from the costs, GDV and assumptions entered. A lender must agree the valuation, eligible costs, contribution, interest allowance and drawdown conditions before the facility is committed.
Construction & staged drawdowns
How are construction funds released?
Funds are generally released in stages against an agreed budget and programme, supported by the monitoring surveyor’s assessment and satisfaction of drawdown conditions. Many facilities reimburse work already completed. Establish the submission requirements, payment cycle and working-capital gap before agreeing payment terms with the contractor.
What does the lender’s monitoring surveyor do?
The monitoring surveyor assesses the cost plan, programme and progress for the lender. During the works, reports address expenditure, remaining costs, contingency and whether sufficient funds remain to complete. This role is distinct from the developer’s contract administrator or project manager; the lender’s monitor does not take over delivery of the scheme.
Can materials, deposits or off-site manufacture be funded in advance?
These items require specific agreement. A lender may require evidence of ownership, insurance, vesting arrangements, storage or additional protection before funding materials not incorporated into the works. Do not assume a supplier deposit or off-site manufacturing payment will qualify for the normal drawdown cycle.
What happens if costs increase or the programme slips?
The lender will reassess the remaining budget, contingency, interest allowance and cost to complete. The borrower may need to contribute further cash; an increase to the facility or term is not automatic. Early reporting with a revised cost plan and programme gives the parties a basis for deciding how the works can proceed.
Can I change the contractor, design or specification during the project?
Material changes usually require lender consent and updated advice from the relevant professionals. A change may affect planning, insurance, warranties, costs, programme and valuation. Check the facility’s consent requirements before committing to changes rather than assuming unused budget can be redirected freely.
Can finance be arranged for a partly completed or stalled scheme?
It may be possible where the remaining works and costs can be established and the completed value supports the borrowing. The lender will investigate why the original programme or funding failed, the status of contractors and warranties, and any existing debt. Independent assessment of the cost to complete is particularly important.
How are multi-phase developments funded?
A facility can be structured around defined phases, separate drawdowns and agreed sales or refinance assumptions. Shared infrastructure costs and dependencies between phases must be included. Sale proceeds may have to reduce debt rather than fund later phases, so recycling arrangements and release conditions need to be explicit.
Borrower, contractor & legal requirements
Is previous development experience essential?
Most development lenders give substantial weight to delivery experience on comparable schemes. A less experienced sponsor may be considered with an appropriate contractor, professional team, financial contribution and project. Experience should be evidenced by completed transactions, roles performed, costs and outcomes rather than a general property background alone.
Can the borrower be a new SPV or an overseas-owned company?
A new SPV can be an acceptable borrowing vehicle. The lender assesses the sponsors, ownership structure, financial resources and source of funds behind it. Overseas ownership may require additional due diligence and legal advice. Agree the borrower and security structure before incurring restructuring or acquisition costs.
What security and guarantees will a lender require?
A first legal charge over the site is usual. Company borrowing may also involve a debenture, personal or corporate guarantees and assignments or rights over project documents. Requirements vary by lender and scheme. Review the scope, limits, consent obligations and release conditions with the legal advisers before accepting the facility.
Can I use my own contractor and professional team?
The lender assesses the proposed contractor and team, including relevant experience, capacity, financial standing, appointments and insurance. Direct-labour or construction-management arrangements require a suitable funding structure and are not accepted by every lender. The lender will normally appoint its own valuer, legal adviser and monitoring surveyor.
What information is needed to obtain indicative terms?
Provide the site address and ownership position, planning information, development appraisal, cost plan, programme, unit schedule and GDV evidence. Include the borrowing required, available contribution, developer track record, contractor details and proposed exit. Initial terms remain subject to credit approval, valuation, technical review and legal due diligence.
How long does it take to complete a development facility?
Some loans can be arranged in 4 weeks, but typically, for larger ground up schemes, it is more common to be 8–12 weeks for completion. The timetable depends on the scheme’s readiness and the lender’s requirements. Valuation, monitoring surveyor review, planning and title matters, construction documents and security must be satisfactory before funds can be released. An early indication of terms is distinct from a completed facility; identify the acquisition deadline and outstanding documents at the outset.
Sales, refinancing & loan exit
What happens to the proceeds when individual units are sold?
The facility specifies the amount required to release each unit from security. The lender may require all net proceeds or an agreed minimum release amount until particular debt or coverage tests are met. Do not assume the sale price becomes available for other works or distributions.
Can completed units be retained and refinanced instead of sold?
Yes, if the proposed investment lender’s valuation, rental coverage, tenancy and borrower requirements support repayment of the development debt. Assess that exit before starting the project. A GDV based on individual sales may differ from the value or debt capacity of a retained investment block.
What is development exit finance?
Development exit finance can refinance a completed scheme while sales continue or long-term finance is arranged. It may release capital where the valuation and loan structure permit. It is a separate lending decision, with its own fees, valuation and security requirements. See development exit bridging loans.
How does finish-and-exit funding differ from a development exit loan?
Finish-and-exit funding includes an allowance to complete outstanding works as well as refinance existing debt where appropriate. A conventional development exit facility is intended for a completed or sufficiently complete asset within the lender’s criteria. The scope of remaining work, completion certification and outstanding budget determine the available structure.
Can the development facility be repaid early?
Early repayment terms depend on the agreement. Minimum interest, an exit fee or other contractual charges can still apply when a scheme sells or refinances ahead of schedule. For phased repayments, check how unit releases reduce interest and whether fees are calculated on the original facility, drawn balance or completed value.
What if sales take longer than forecast?
The remaining debt, interest allowance, unit values and sales evidence will need to be reviewed. An extension, development exit facility or investment refinance may be possible, but none is guaranteed. Address the position before maturity and include realistic disposal periods in the original appraisal.